Hi Guys, well I feel I've turned the corner and am on the home straight.
Flipped KRZ back onto her wheels after a couple of months modifying the
belly
and adding flaps to the stub wings (see my blog). While the flaps are not
100% done they are close enough for now and I needed to have it right side
up to start the remaining big ticket items.

I've launched into the final shaping of the engine cowl and will soon pull a
mould off the currrrvy plug I've been making (history of this is also on the
blog).

My current trade is as a scheduler and my wife shamed me into doing a
schedule
for the KR. If all goes according to plans I should be Test flying next
June.
Most of the things left to do are already 80% done . just need finishing
off.

Things still to do:
*       Finish the Cowl and plenums
*       Finish the Fwd Deck (including a locker instead of a header tank
*       Finish the Turtle Deck
*       Finish the Wings
*       Build the Instrument panel
*       Finish the fuel & elec systems

Paul Smith
Brisbane, AUSTRALIA
pk.sm...@bigpond.net.au
http://kr2spacemodulator.blogspot.com/


Reply via email to