Hi Dear PTLs of : AAA, l2switch, snmp, snmp4sdn, USC

This is a friendly remainder that your projects are still missing the M3
status. Please send your M3 status to release email list.

thanks a lot.

katie

<Project Name>

Functionality Freeze:

1. Final list of externally consumable APIs defined: Yes/No
** If you had any Tentative APIs, have they been moved to Provisional or
Dropped? Yes/No (link to release plan)
** If any of your Tentative APIs were dropped, have you notified all
projects that were expecting them? Yes/No (link to e-mail)
** Also please list all dropped APIs.

2. Are all your inter-project dependencies resolved (i.e., have the other
projects you were counting on given you what you needed)? Yes/No
** If no, please list the features you were expecting that haven't been
delivered and the project you were expecting to receive them from.
** Note that you can only reasonably hold a project to something if you
formally asked for it during the release planning process and they
acknowledged that ask saying they would do it.

3. Were there any project-specific deliverables planned for this
milestone? Yes/No
** If so, were they delivered? Yes/No

Karaf Features Defined:

4. Are all your project's features that are intended for release added to
the features.xml and checked into the integration git repository? Yes/No
** (please provide link to features.xml)
** (please provide link to the gerrit patch that checks into the
integration git repository)

5. List all top-level, user-facing, and stable Karaf features for your
project.
** For top-level, user-facing, and stable Karaf features, please provide a
one-sentence description which a developer and/or user would find helpful.

Documentation:

6. List the kinds of documentation you will provide including at least:
** One user/operator guide section per user-facing feature.
** One developer guide per top-level feature.
** An installation guide for any top-level features that require more
than feature:install <feature-name> to install.
** Optional tutorials and how tos.

7. Have you checked in the AsciiDoc outlines to the docs repository? Yes/No
** (link to gerrit patch)

Integration and Test:

8. Have you started automated system testing for your top-level
features. Yes/No
** If yes, link to test report
** If no, why?

9. Have you filled out basic system test plan template [1] for each
top-level feature (karaf and not karaf) and a comprehensive system test
plan template including functionality, cluster, scalability, performance,
longevity/stability for each stable feature? Yes/No
** If yes, link to test plans
** If no, why?

Project Specific:

10. Have you updated your project facts with the project type
category? Yes/No
11. Do you acknowledge the changes to the RC Blocking Bug Policy for Carbon
Release [2]? Yes/No



[0] https://wiki.opendaylight.org/view/Simultaneous_Release:
Carbon_Release_Plan
[1] https://wiki.opendaylight.org/view/CrossProject:Integration_
Group:Feature_Integration_System_Test_Template
[2] https://lists.opendaylight.org/pipermail/tsc/2016-December/006468.html




-- 
Best

katie
_______________________________________________
L2switch-dev mailing list
L2switch-dev@lists.opendaylight.org
https://lists.opendaylight.org/mailman/listinfo/l2switch-dev

Reply via email to