Hi All,

Im having a bit of a problem coming up with a solution for my PID
loop.
What I would like to do is to toggle the SP between two set values (0
and 5 MPa). I know you can do somthing like this with SP Profile, but
this does not suit my requirements as I would like to ensure that the
Process Variable reaches the SP and soaks for a set time (this is not
guaranteed with SP Profile). Once this soak time is achieved, I would
like to toggle setpoint (with a boolean or such). The problem i am
having is getting a suitable signal that determines that the soak time
has been achieved and use this signal to change the SP.

Any ideas on how this can be implemented? Anything would be of great
help.

thanks in advance

David

Reply via email to