On Wed, 30 Aug 2017, Bo Berglund via Lazarus wrote:

I just want to check with you which way is safer when using Move()
commands in a procedure to combine two TBytes arrays by inserting one
into the other at a specified point.


What I need to do is the following:
- Increase the size of the Dest array by the length of the Src array
- Move the data following the insertion point in the Dest array
towards the end starting at Index
- Copy the data from the Src array into Dest at Index where the hole
has been created

Like this:

procedure  InsertBytes(var Dest: TBytes; Src: TBytes; Index: integer);
var
 LenD, LenS: integer;
begin
 if Length(Src) = 0 then exit;
 LenD := Length(Dest);
 LenS := Length(Src);
 if Index > LenD then Index := LenD;  //Make an append instead
 SetLength(Dest, LenD + LenS);
 Move(Dest[Index], Dest[Index + LenS], LenD - Index);  //Create space
 Move(Src[0], Dest[Index], LenS);  //Insert data
end;

If the calculation of the number of bytes to move (LenD - Index) for
some reason is wrong and results in too many bytes being moved, what
will happen then? Will Move() overwrite whatever is following the Dest
array in memory?

Yes.


Would it be safer to use a local intermediate array to combine Dest
and Src and then in the end Move the data back into Dest?

Not really. If you calculate lengths wrong, the end result is unpredictable in any case.


I have tested the above procedure and it looks OK, but I am worried
that in some cases the same kind of construct would be wrong and maybe
cause unknown side effects.
I must use Move() for handling other data of various kinds like packed
records and such too...

If the packed records contain managed data (ansistrings and the like): Don't use move.

Michael.

--