On 11/20/2011 1:13 PM, Ian Batten allegedly wrote:
Which isn't a use-case for passing times being measured manually at
manual signal boxes and manually written onto paper sheets for manual
analysis, of course.
Yes. The systems I was working on replaced those paper sheets with
computer screens and recorded times to the second, but by design did not
interface directly with the track control circuitry. That was being put
off until the next generation of systems.
--
--Paul
_______________________________________________
LEAPSECS mailing list
[email protected]
http://six.pairlist.net/mailman/listinfo/leapsecs