On 11/20/2011 1:13 PM,  Ian Batten allegedly wrote:
Which isn't a use-case for passing times being measured manually at
manual signal boxes and manually written onto paper sheets for manual
analysis, of course.

Yes. The systems I was working on replaced those paper sheets with computer screens and recorded times to the second, but by design did not interface directly with the track control circuitry. That was being put off until the next generation of systems.
--
        --Paul

_______________________________________________
LEAPSECS mailing list
[email protected]
http://six.pairlist.net/mailman/listinfo/leapsecs

Reply via email to