On Mar 29, 2009, at 3:43 AM, Mark Carter wrote:
My argument is that if I specify an end date, then I want ledger to assume that the current date is the end date I specify, and perform all reports and calculations on that basis. After all, if you stick with the current implementation, it could easily mess up any historical reporting you try to do. Comments?
You are correct, this should be the behavior. You've solved for me the mysterious of what the "terminus" variable meant in the 2.x sources, since I had failed to document it. :)
John
