At the very least, the docs must be revised and the slideshows
completed before releasing a1.  This will likely take several days.
Maybe even a week.

I would also like to add ctags-based autocompletion before releasing
a1.  I agree with Ville: this is the last major piece of the puzzle.
Including autocompletion in a1 will accelerate it's development. Leo
will never be completed while I am able to work, but there is a real
sense in which Leo remains unfinished while autocompletion remains
mostly missing.  It's time to finish Leo in this sense.

I would like to release a1 in about two weeks.  My goal is to release
Leo 4.8 final before the end of 2010.  I'm aiming for earlier--say the
end of November.

Edward

P.S. After Leo 4.8, my first goal will be to better support vim (or
emacs viper) bindings.  I myself am keen to avoid alt and control keys
as much as possible.

EKR

-- 
You received this message because you are subscribed to the Google Groups 
"leo-editor" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/leo-editor?hl=en.

Reply via email to