I would like to release 5.0 a1 on Friday, October 17.  This is a stretch 
because lots of documentation and notes must be folded into the release 
notes.

Not all bugs targeted for 5.0 b1 need to be fixed by a1--only those bugs 
that have major, file-related consequences.  This includes bug 35 relating 
to gnx's. I'll fix the import bugs if I can, but they have only localized 
consequences.

The point is that a1 releases typically highlight release-related issues.  
I'll be fixing the existing bugs and the new release-related bugs in 
parallel until all release issues are fixed.  At that point I'll delay b1 
if necessary until all important bugs are fixed.  It may well be close to 
November before b1 goes out the door.

Edward

-- 
You received this message because you are subscribed to the Google Groups 
"leo-editor" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/leo-editor.
For more options, visit https://groups.google.com/d/optout.

Reply via email to