https://bugs.documentfoundation.org/show_bug.cgi?id=157786
Bug ID: 157786
Summary: DAY function is one day off for dates before epoche
day, if input is ISO date-time string
Product: LibreOffice
Version: 24.2.0.0 alpha0+ Master
Hardware: All
OS: All
Status: UNCONFIRMED
Severity: normal
Priority: medium
Component: Calc
Assignee: [email protected]
Reporter: [email protected]
Created attachment 190227
--> https://bugs.documentfoundation.org/attachment.cgi?id=190227&action=edit
DAY(ISO String) for date before epoche date
Open attached file.
The result for DAY("1899-12-29T15:26:14") should be 29 but is 30.
--
You are receiving this mail because:
You are the assignee for the bug.