Hi Joey. I'm swamped with other things and can't reply today. I will look into this over the next few days.
-- Michael On Wed, Mar 30, 2011 at 4:44 AM, Joey Stanford <[email protected]> wrote: > Hi Gang, > > We're trying to fill in the Engineering section of the member report > today. I tried to find interesting things from the past status > reports but only found the Android kernel and LTTng news. Asac and > Jamie added a few more items. Below is what we have currently. If you > have anything else that should/could go into the March update, please > reply back. Time is of the essence. Thanks. > > https://docs.google.com/a/linaro.org/document/d/1o8gVwLJa-gXYUKgdfh0ilXsbrFBBv5XNnZsVHont1kU/edit?hl=en# > > > * A Microsoft Kinect-wearing Linaro and Android powered robot was > produced which can be seen at: > o http://www.youtube.com/watch?v=8EgfAk5RBVo > o A copy of this robot will also be demonstated at the > Linaro@UDS event > * A new 2.6.38 based Android kernel for panda and beagle is available at: > o http://git.linaro.org/gitweb?p=people/jstultz/android.git;a=summary > * A first beta preview of Linaros cloud based embedded build > service used for android is available at: > o http://android-build.linaro.org > * Multi-arch, the mechanism to install non-native library-packages > (ARM on x86, x86 on ARM e.t.c) was deployed to the Ubuntu archive > o more information on multi-arch can be found at: > http://wiki.debian.org/Multiarch/Implementation > * LTTng 0.245 has been ported to the linux-linaro-2.6.38 kernel > > * A thumb2 enabled kernel build has been turned on after work by > both the Kernel Working Group and the Developer Platform team. > > * The developer-focused nano image was reduced in size to 125mb, > plans are being discussed for this to be stripped even further to > enable the image to be used in simulations > * Initial metrics from the [email protected] project have be produced > * A planet aggregation service bringing together Linaro > engineering blog posts has been deployed at: > o http://planet.linaro.org > * The number of boards in the validation farm increase to 10, with > 7 different varieties installed > _______________________________________________ Mailing list: https://launchpad.net/~linaro-project-management Post to : [email protected] Unsubscribe : https://launchpad.net/~linaro-project-management More help : https://help.launchpad.net/ListHelp

