Ouch.
It was just a question.

Carol 

On Jun 8, 2023, at 11:31 PM, john gregg via Lincoln <[email protected]> wrote:



Who cares about the roads, it is about putting electric planes in the air and shutting down the economy that Hanscom provides. See this impacts those of us over on the other side of town, they just care about how it impacts them on the other side of the tracks and the noisy planes that fly over once every month or two so they can virtue signal while John Kerry, Bill Gates, Taylor Swift and so many others jet around using airports just like Hanscom but also provide jobs and a military base relying on the surrounding communities. Difference is these fat cats pay money to offset their carbon usage in a carbon tax to make themselves feel better about the damage they have done, but not for the rest of us. 

My opinion is this will take awhile, most likely before winter but a lot of moving dirt and cleaning up to ensure they are meeting environmental, Federal and of course State regulations and the safety of those who work on the base. When has any Federal or State Government project ever come in on time and at cost of course. 

Thank You,

John Gregg
Lincoln soon to be Sudbury 
On Thursday, June 8, 2023 at 02:12:54 PM EDT, Andy Wang <[email protected]> wrote:


I could be mistaken, but I think the original poster was actually referring to the road work, not the runway work.   The road work into Hanscom via Sarain gate (formerly Vandenburg gate) is currently being worked.  The intersection of Old Bedford Rd. and Hanscom Drive will be a more standard 4 way intersection instead of whatever you call what it was previously.  At the same time, they are also constructing a new visitors center and search area and gate house.  I thought it was supposed to be four or five months, but it feels like it's been  longer than that.

On Thu, Jun 8, 2023 at 12:39 PM Alice Waugh <[email protected]> wrote:
This was also in the Lincoln Squirrel:



On Thu, Jun 8, 2023 at 6:57 AM Christopher Eliot <[email protected]> wrote:
I am hoping someone might have access to information about the Sarain gate/Hanscom drive roadwork. I can’t seem to find anything on the web other than the initial Hansoom AFB news report from Nov 2022. What is the projected completion date.  Will the new traffic pattern be permanent?  Will the prior traffic pattern return or something in between?

Thank you
Carol
Virginia Rd Resident,


The project will take place over a 37 day period, but work will only be done during the day Monday-Friday in that period (20 working days).

More information is available in Bedford Citizen articles.




Here is the full description from the last Massport projects report.

July 2022: Runway 5-23 south of Runway 11-29 is scheduled for rehabilitation during summer of 2023. Additional project information will be available once the project team has been selected. January 2023: The advertising date is February 15th with scheduled bid opening on March 8th. The project is estimated to begin on June 1 and take approximately 35 days. February 2023: The bid was posted on February 15th and closes on March 8. The project team will update HFAC at the March 2023 meeting. March 2023: The project is anticipated to begin June 1 and there will be a full closure of the runway for 37 days. April 2023: Massport will issue a press release for the project which will include contact information. Scheduled updates will likely appear on the Massport website. A link to the information will be provided to HFAC when it is available. May 2023: Project is expected to begin on June 5. Concerns can be made via the noise line (781) 869-8050 

--
The LincolnTalk mailing list.
To post, send mail to [email protected].
Browse the archives at https://pairlist9.pair.net/mailman/private/lincoln/.
Change your subscription settings at https://pairlist9.pair.net/mailman/listinfo/lincoln.

--
The LincolnTalk mailing list.
To post, send mail to [email protected].
Browse the archives at https://pairlist9.pair.net/mailman/private/lincoln/.
Change your subscription settings at https://pairlist9.pair.net/mailman/listinfo/lincoln.

--
The LincolnTalk mailing list.
To post, send mail to [email protected].
Browse the archives at https://pairlist9.pair.net/mailman/private/lincoln/.
Change your subscription settings at https://pairlist9.pair.net/mailman/listinfo/lincoln.

--
The LincolnTalk mailing list.
To post, send mail to [email protected].
Browse the archives at https://pairlist9.pair.net/mailman/private/lincoln/.
Change your subscription settings at https://pairlist9.pair.net/mailman/listinfo/lincoln.

-- 
The LincolnTalk mailing list.
To post, send mail to [email protected].
Browse the archives at https://pairlist9.pair.net/mailman/private/lincoln/.
Change your subscription settings at 
https://pairlist9.pair.net/mailman/listinfo/lincoln.

Reply via email to