Will the rent increase for Leap to move into a 3.5 million dollar new space ? Will the cost be passed along to the families who need the after school care? This could likely be avoided by sharing the school building.
Carol Ryan

Sent from my iPhone

On Sep 29, 2023, at 1:51 PM, Barbara Low <[email protected]> wrote:


If LEAP were to move into the school building during a construction project, why not a permanent move to a school that is certainly large enough to accommodate this program?

Barbara Low 

From: Lincoln <[email protected]> on behalf of Carol Ryan <[email protected]>
Sent: Friday, September 29, 2023 12:27 PM
To: kathryn hawkins <[email protected]>
Cc: Lincoln Talk <[email protected]>
Subject: Re: [LincolnTalk] Operations during proposed construction
 
Most likely Leap will move into the school building.

Sent from my iPhone

On Sep 29, 2023, at 12:22 PM, kathryn hawkins <[email protected]> wrote:


Hi Carol-

I suppose we will get to that once things are decided on.  It is a very good question:)

Sent from Gmail Mobile


On Fri, Sep 29, 2023 at 12:06 PM Carol Ryan <[email protected]> wrote:
Would Ms. Hawkins please explain what the plan would be for Leap during construction.
 Thank you, Carol Ryan

Sent from my iPhone

> On Sep 29, 2023, at 12:02 PM, Carol Ryan <[email protected]> wrote:
>
> 
>
> Sent from my iPhone

-- 
The LincolnTalk mailing list.
To post, send mail to [email protected].
Browse the archives at https://pairlist9.pair.net/mailman/private/lincoln/.
Change your subscription settings at 
https://pairlist9.pair.net/mailman/listinfo/lincoln.

Reply via email to