Mmmmm ...
And the real kicker is ... It will be even more obsolete by the time it's
installed and they'll probably be hunting around for a replacement even before
the FTTN network is complete.
What an utter waste of money. These people have no concept of building for the
future.
And all for only 2/3 the cost of 1GBs or better fibre to the home. The business
case for this technological millstone around the nation's neck will make
terrific reading.
Regards,
----
On 18 Nov 2013, at 8:52 am, Jan Whitaker <[email protected]> wrote:
> At 08:35 AM 18/11/2013, Kim Holburn wrote:
>>> The Coalition government's planned Fibre to the Node (FttN)
>> network is unlikely to start rolling out before 2015, potentially
>> delaying its timetable of providing download speeds of between 25
>> and 100 megabits per second by the end of 2016 and 50 to 100
>> megabits per second by 2019.
>>>
>>> The proposed FttN network will require the installation of
>> approximately 50,000 to 60,000 nodes and a source told Technology
>> Spectator that at best NBN Co could get 200 nodes rolled out a week.
>>>
>>> With the rollout at scale expected to start around early 2015, it
>> could take NBN Co six years to roll the FttN network out at 200 nodes a week
>
> Gee, maybe it would have been better if Uncle Mal and Co had run an
> engineering and business study before making their promises, too, eh?
> Conroy must be laughing his anatomy off about now.
>
> Jan
>
>
>
> Melbourne, Victoria, Australia
> [email protected]
>
> Sooner or later, I hate to break it to you, you're gonna die, so how
> do you fill in the space between here and there? It's yours. Seize your space.
> ~Margaret Atwood, writer
>
> _ __________________ _
> _______________________________________________
> Link mailing list
> [email protected]
> http://mailman.anu.edu.au/mailman/listinfo/link
_______________________________________________
Link mailing list
[email protected]
http://mailman.anu.edu.au/mailman/listinfo/link