On 21/10/2015 2:16 PM, David Boxall wrote: > What's the logic here? :/ > <http://www.itnews.com.au/news/nbn-spent-14m-on-1800km-of-new-copper-for-fttn-410778> > Nothing to see here, move on. There was always a need for copper cables between the pillar and the adjacent node cabinet - with roughly 200 premises served by a pillar, thats roughly 400 pairs+extra required, and if the cabinet is anything up to 100 metres away (and occasionally up to 300m apparently) thats roughly half a kilometre of 100-pair cable required to hook up a single node cabinet.
as I said on another list just now, next journos will be making a mountain out of the hectares of sheet steel required to build the ~60,000 cabinets. Paul. _______________________________________________ Link mailing list [email protected] http://mailman.anu.edu.au/mailman/listinfo/link
