When --idle-hist option is used, run/wait time and sched delay value
should be shown for idle task only.  But due to internal accounting, a
last thread has same value of next idle task's and it was shown.

In the below example, firefox after idle task has same run time of
idle task's.

  $ perf sched timehist --idle-hist
  Samples do not have callchains.
             time    cpu  task name             wait time  sch delay   run time
                          [tid/pid]                (msec)     (msec)     (msec)
  --------------- ------  --------------------  ---------  ---------  ---------
    197731.754335 [0002]  firefox[17773/17739]      0.000      0.000      0.000
    197731.754486 [0001]  sleep[27470]              0.000      0.000      0.000
    197731.754903 [0002]  <idle>                    0.047      0.000      0.567
    197731.754981 [0002]  firefox[17773/17739]      0.000      0.000      0.567
    197731.755922 [0002]  <idle>                    0.078      0.000      0.941
    197731.755994 [0002]  firefox[17773/17739]      0.000      0.000      0.941
  <SNIP>

Signed-off-by: Namhyung Kim <[email protected]>
---
 tools/perf/builtin-sched.c | 9 +++++++++
 1 file changed, 9 insertions(+)

diff --git a/tools/perf/builtin-sched.c b/tools/perf/builtin-sched.c
index 405a91d0515f..64a0959bccd7 100644
--- a/tools/perf/builtin-sched.c
+++ b/tools/perf/builtin-sched.c
@@ -2439,6 +2439,15 @@ static int timehist_sched_change_event(struct perf_tool 
*tool,
                                goto out;
 
                        timehist_update_runtime_stats(last_tr, t, tprev);
+                       /*
+                        * remove delta time of last thread as it's not updated
+                        * and otherwise it will show an invalid value next
+                        * time.  we only care total run time and run stat.
+                        */
+                       last_tr->dt_run = 0;
+                       last_tr->dt_wait = 0;
+                       last_tr->dt_delay = 0;
+
                        if (itr->cursor.nr)
                                callchain_append(&itr->callchain, &itr->cursor,
                                                 t - tprev);
-- 
2.10.2

Reply via email to