On Mon, Apr 19, 2010 at 01:05:52PM -0600, Howard, Chris wrote: > > I assume you have ruled out some kind of marginal power > situation in the machine room?
Good thought, but unlikely here... whole machine room is on a UPS (which seems happy and has no events). While these machines are mostly in one rack, that rack has 8 PDUs on separate circuits. (All of the SC1435s are running on 120V, single phase from a 208V/3 phase distribution system). Machines with issues are spread out across the PDUs (and multiple phases). I'm more concerned/thinking that with 70-71 degree F intake air, the SC1435 can't deal with running "flat out" in an HPC environment. Thanks! --- Cris -- Cristopher J. Rhea Mayo Clinic - Research Computing Facility 200 First St SW, Rochester, MN 55905 [email protected] (507) 284-0587 _______________________________________________ Linux-PowerEdge mailing list [email protected] https://lists.us.dell.com/mailman/listinfo/linux-poweredge Please read the FAQ at http://lists.us.dell.com/faq
