FYI. Power shutdown on IIT campus on Sunday morning. I had not seen this
earlier ...

The meet is in the evening, so lets keep our fingers crossed.

Sameer.

-- forwarded message --
Newsgroups: it.general
Subject: [Sysads] TOTAL POWER SUPPLY SHUT DOWN FOR THE ENTIRE CAMPUS ON
 12.9.2004 (fwd)
Date: Wed, 8 Sep 2004 16:15:47 +0530
Organization: Kanwal Rekhi School of Information Technology



                  INDIAN INSTITUTE OF TECHNOLOGY BOMBAY
=09            Electrical Maintenance Division

No: EMD/B-28/2004          CIRCULAR=09=096th  Sept. 2004

TOTAL POWER SUPPLY SHUT DOWN FOR THE ENTIRE CAMPUS ON 12.9.2004

This is to inform all the electricity users in the Campus that M/s. The Tat=
a
Power Co. Ltd., supplier of electricity,  is carrying out metering potentia=
l
transformer  structure replacement/repair on 12.9.04  Sunday.  The mutually
agreed time for the work is about two and half hours starting from 09.00 a.=
m.
on 12.9.04.  To carry out this work,  22KV supply to the entire campus has =
to
be kept off.  Though the work is planned, the same is being carried out by
outside agency, and hence users are requested to bear with the inconvenienc=
e
if the time is extended due to necessity of unexpected work.

Inconvenience caused is regretted.

=09=09=09=09=09Executive Engineer(Elect.)(SG)
_______________________________________________
Sysads mailing list

-- end of forwarded message --

-- 
Research Scholar, KReSIT, IIT Bombay
http://www.it.iitb.ac.in/~sameerds/

-- 
http://mm.ilug-bom.org.in/mailman/listinfo/linuxers

Reply via email to