FYI. Power shutdown on IIT campus on Sunday morning. I had not seen this
earlier ...
The meet is in the evening, so lets keep our fingers crossed.
Sameer.
-- forwarded message --
Newsgroups: it.general
Subject: [Sysads] TOTAL POWER SUPPLY SHUT DOWN FOR THE ENTIRE CAMPUS ON
12.9.2004 (fwd)
Date: Wed, 8 Sep 2004 16:15:47 +0530
Organization: Kanwal Rekhi School of Information Technology
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY
=09 Electrical Maintenance Division
No: EMD/B-28/2004 CIRCULAR=09=096th Sept. 2004
TOTAL POWER SUPPLY SHUT DOWN FOR THE ENTIRE CAMPUS ON 12.9.2004
This is to inform all the electricity users in the Campus that M/s. The Tat=
a
Power Co. Ltd., supplier of electricity, is carrying out metering potentia=
l
transformer structure replacement/repair on 12.9.04 Sunday. The mutually
agreed time for the work is about two and half hours starting from 09.00 a.=
m.
on 12.9.04. To carry out this work, 22KV supply to the entire campus has =
to
be kept off. Though the work is planned, the same is being carried out by
outside agency, and hence users are requested to bear with the inconvenienc=
e
if the time is extended due to necessity of unexpected work.
Inconvenience caused is regretted.
=09=09=09=09=09Executive Engineer(Elect.)(SG)
_______________________________________________
Sysads mailing list
-- end of forwarded message --
--
Research Scholar, KReSIT, IIT Bombay
http://www.it.iitb.ac.in/~sameerds/
--
http://mm.ilug-bom.org.in/mailman/listinfo/linuxers