Hi,

 

I'd like to get some information/direction about the intended
connectivity of the lttng views so that if I make some modifications,
they are either useful to the lttng viewer project, or, at a minimum,
not out of whack with how the project is going to move forward.

 

Specifically, I am looking at the time frame view and how it is to
interact with other views.  The problem I'm running into is that the
control flow and resources view have their own zoom/next/prev/ etc.
states.  My questions/comments:

 

1.       I assume the resources/control flow views should be kept in
sync with zoom operations if the 'sync' button is enabled?

2.       wrt to the TimeFrame view, should it always reflect the 'last
selected' control flow/resource view or is there a different
expectation?

 

Thanks,

 

n  Rick

_______________________________________________
linuxtools-dev mailing list
linuxtools-dev@eclipse.org
https://dev.eclipse.org/mailman/listinfo/linuxtools-dev

Reply via email to