Haven’t used this script in a long time. Got the script figured out but can’t recall from the recesses of my brain the best way to set up the software updates deployment to leverage it.
Specifically, the deadline (immediate, way in the future), I assume suppress reboot so the script can handle this, and then how often to run the script job (I assume daily?) Thanks all, Casey
