I have been experiencing some strange behaviours with our scheduled TFS
Builds since upgrading to SP1.  

 

Note: All my builds were created in TFS 2008 pre SP1, I have since
upgraded all our systems to SP1 when the problem started occurring.  All
machines ( TFS, build and developer PCs ) are in the same time zone.

 

My problem is that builds don't seem to be triggering on the correct
days, I have had a bit of a look at the TFS database and discovered the
dbo.tbl_Schedule in the TfsBuilds database and have been having a bit of
a play with the configuration of my builds in team explorer.  I have
observed that in the Schedule table there is a column for each day of
the week ( Weekday1 - Weekday7 ) however If I have two build definitions
scheduled to run on the same days the Weekday columns for the two builds
do not match.  This seems to be the root of my problem as one of the
builds does run on the correct days and the other doesn't.  

 

Does anybody know if these Weekday columns should match the same day of
the week for each build definition, or is there something else that I am
missing?

 

Thanks

Daniel 

 

-- 
This transmission is for the intended addressee only and is confidential 
information. If you have received this transmission in error, please notify the 
sender and delete the transmission. The contents of this e-mail are the opinion 
of the writer only and are not endorsed by the Mincom Group of companies unless 
expressly stated otherwise.
-- 








OzTFS.com - to unsubscribe from this list, send a message back to the list with 
'unsubscribe' as the subject. View the web archives at 
http://www.mail-archive.com/[email protected]/
Powered by mailenable.com, supported by www.readify.net

Reply via email to