List things left for next point release: 1. [API-NEXT PATCHv3] linux-generic: pool: defer ring allocation until pool creation // Bill
waiting for Petris feedback 2. [PATCH 0/2] test: linux-gen: vlan insertion: fixes // Maxim Needs review. 3. Changelog 4. FAIL: ../../test/common_plat/validation/api/scheduler/scheduler_main https://ci.linaro.org/job/odp-api-check/ARCH=arm64,label=docker-jessie-arm64,pktio=ipc/965/console After latest changes this CI task becomes unstable. I.e. some times pass, sometimes not. Needs investigation, might be related to pool size limit in different containers which CI run. (There was old bug with limit of 64Mb of shared memory for container.) 'next' branch is almost ready and collecting all things which is reasonable to merge. Please ping me if something is missing. Thank you, Maxim.
