List things left for next point release:

1. [API-NEXT PATCHv3] linux-generic: pool: defer ring allocation until
pool creation // Bill

waiting for Petris feedback

2. [PATCH 0/2] test: linux-gen: vlan insertion: fixes // Maxim

Needs review.

3. Changelog

4.  FAIL: ../../test/common_plat/validation/api/scheduler/scheduler_main

https://ci.linaro.org/job/odp-api-check/ARCH=arm64,label=docker-jessie-arm64,pktio=ipc/965/console

After latest changes this CI task becomes unstable. I.e. some times
pass, sometimes not. Needs investigation, might be related to pool size
limit in different containers which CI run. (There was old bug with
limit of 64Mb of shared memory for container.)

'next' branch is almost ready and collecting all things which is
reasonable to merge. Please ping me if something is missing.

Thank you,
Maxim.

Reply via email to