> Whether a BCP draft is desired is something I am open to considering.
Process nit: what we’re talking about doing, regardless of how we do it, is overriding 10589. As that’s a normative reference, overriding that requires that we have a standards track document. I don’t believe that even a BCP is sufficient. Well, that’s my understanding, at least. Tony _______________________________________________ Lsr mailing list [email protected] https://www.ietf.org/mailman/listinfo/lsr
