The weekly Data Management Project Manager's Online Meeting was conducted on Friday, August 8, at the usual time and place (10:00am PDT/PST, dial-in is 866 330 1200 passcode 300 2363, video is the NOAO bridge at IP 140.252.1.34).
Attendees: Ray Plante Cristina Beldica Deborah Levine Jeff Kantor Agenda: Inter-group topics (Telescope & Site, Camera, System Engineering) Camera Input: 1. Study sensors coming out of fab within a month 2. focal plane curvature update by Seppala on the 16th during the normal camera meeting 3. starting to develop break-outs for the camera collaboration meeting September 18th 4. working on DOE budgets and white paper for submission at the end of August Reference Design Review - Schedule and rough outline sent, Jeff will send more detailed outline/template out early next week Cost Estimates - AC labor still showing old levels in latest import into Primavera, Cristina to validate current spreadsheet that is in docushare. Increase from 97 to 100 TF at AC is already handled by 1 year slip in MREFC start, so no changes at this time. CPU price/performance trends used at Mtn/Base and AC are different, need to resolve ASAP, no later than Monday. Will discuss at TechAssessWG. IPAC now working on down-scope estimate to fit within targets set by Jeff, should be ready today. DC1 - Readiness to start Stage 2: Ray will verify starting today, notify Jeff if issues. Met with SDSC on SRB/Stage 1 re-run, SDSC are getting direct access to the environment to analyze it. NCSA have reserved next week on TG for re-run, will depend on progress. Administrative - Travel budgets for the rest of FY06 are tight, try to limit travel Auditor comments on Monthly Reports - Cristina to continue saving emails and to annotate report with date that individual institutions submitted their reports. _______________________________________________ LSST-data mailing list [email protected] http://www.lsstmail.org/mailman/listinfo/lsst-data
