The weekly Data Management Project Manager's Online Meeting was conducted on
Friday, August 18, at the usual time and place (10:00am PDT/PST, dial-in is
866 330 1200 passcode 300 2363, video is the NOAO bridge at IP
140.252.1.34).

Attendees
Don Dossa
Arun Jagatheesan
Deborah Levine
Chris Smith
Jeff Kantor

Agenda
Inter-group Topics (Telescope and Site, Camera, System Engineering)
NONE

Reference Design Reviews -
Progress of Reviews (Sys Eng Postponed, Camera/Cal conducted 8/17, T&S 8/21,
DM 8/22)
Draft slideset/storyboard (#2082) posted prior to today¹s meeting.  Jeff
needs some help on infrastructure tables, will post COB today and send email
to people to validate certain slides.  Need responses by noon Monday if
possible.

Cost Estimates - 
Thomas Frey froze and imported again on Monday, 8/14.  Jeff is validating,
adding in-kind estimates.  Need to start working on estimates for
Commissioning Phase, which according to MREFC guidelines must be in proposal
proper (not Operations Plan).  We will increase the proposal budget to cover
this phase work.  SDSC to examine CPU to ensure adequate for serving,
transferring data.

DC1 - 
Progress check on Stage 1 analysis ­ Now transferring 90 MB/s from single
node to single node on TG, from login node at SDSC to login node at NCSA.
Made changes in software for performance on TG:
Buffer size, window size, max. number of threads.  TG is using SuSE, and
software opens too many threads for SuSE environment limit (6 pthreads/CPU).


_______________________________________________
LSST-data mailing list
[email protected]
http://www.lsstmail.org/mailman/listinfo/lsst-data

Reply via email to