The weekly Data Management Project Manager's Online Meeting was conducted on
Friday, September 1, at the usual time and place (10:00am PDT/PST, dial-in
is 866 330 1200 passcode 300 2363, video is the NOAO bridge at IP
140.252.1.34).

Attendees
Ray Plante
Chuck Claver
Kirk Gilmore
Jeff Kantor

Agenda
Inter-group Topics (Telescope and Site, Camera, System Engineering)
KG ­ Camera collaboration meeting on Tuesday, 9/19 break-outs (CCS/DAQ) with
DM interest.  Agenda will be published by Tuesday, 9/5/06.
CC ­ Will be standing in for Bill Althouse while he is on medical leave,
rest of year/through proposal period.  Will spend 3 days/week at LSSTC,
working on proposal, system engineering.
ACTION ­ JPK Send description of DCs to CC.

MREFC Proposal Volume I -
Draft slideset/storyboard (#2082) posted Wednesday with writing assignments
in Notes.  We need first draft to Jeff by September 11.
Remaining items:
1. Revised Archive Center Infrastructure Acquisition Plan for Operations (is
1 5-year refresh the most cost-effective?) - Cristina Beldica, Chris Cribbs,
Michelle Butler
2. Revised CPU for Queries - Tim, Jacek
3. Justification for 2-year doubling of CPU ­ Ray Plante, Michelle Butler,
Don Dossa
4. Reliability/single point of failure analysis - Don Dossa
5. Discussion of NVO portal relevance to LSST - Chris Smith
6. System Integration Diagram/text - Jeff

DC1 - 
Progress check on Stage 3 readiness/execution.  TG was down, unplanned down
time was scheduled for this morning.  Assuming TG in good shape, we will
start executing on Monday.  Databases are deployable on TG, running test
today.  Logging is integrated into pipeline and DB services. Data generator
for DB ingest is done, Robyn to integrate into pipeline.  A few minor
deployment issues to clean up.  Data transfer is still in test, made tuning
changes suggested by SDSC.

Ray on travel 9/6 ­ 9/12 at NVO summer school, will be working/online much
of the time.  Greg will drive next week¹s DC1 execution from portal, he and
Steve will be able to push it forward.  Ray will also be on travel 9/18 ­
9/21 at IVOA meeting on Moscow.  Should have connectivity but not sure, but
will be pretty busy.

LSST R&D Plan/FY07 Budget -
In work, we will be contacting people for updated statements of work after
9/15.

Upcoming Meetings/Workshops 2006 -
See document-2282

Post-DC1 activities ­
Create Commissioning Plan/Estimates
FRS, OCD, UML Model updates (including Domain Model/Schema workshop)
Prototyping Environment/SE Practices group
MiddleWG needs to be re-chartered, revisit PL execution/construction