The weekly Data Management Project Manager's Online Meeting was conducted on
Friday, September 15, at the usual time and place (10:00am PDT/PST, dial-in
is 866 330 1200 passcode 300 2363, video is the NOAO bridge at IP
140.252.1.34).

Attendees
Kirk Gilmore
Zeljko Ivezic
Ray Plante
Jacek Becla


Inter-Group
KG - Camera meeting next week, agenda with breakouts posted to lsst-data.

DC1
RP - Stage 3 with Stage 1 integrated is running, small size tests. today.
Large-scale test will be run next week.  Ray is writing report today and
will update late next week (he is back from Moscow on Thursday).

FY07 Costs
JK -Minor reductions in DM budget, will be a very tight year.  Non-labor has
been cut in half, must be very careful with travel costs.  ZI suggests using
skype for telecons, JB says you can have up to 100 simultaneous users now.
JK will check into it.

Proposal
JK will post first draft early Monday.  There appears to be an inconsistency
in Computing Nodes count/TFLOPS at Mtn/Base and Archive Center.  RP will
verify Archive Center and get with Don when he is back to address
consistency issue.  The baseline is doubling power every 2 years, so ref
design slides (not cost estimates) should show representative configuration
that is 25% of 2010 requirements.