Hello:

The LVS knowledge base speaks of dynamic feedback scheduling:
http://kb.linuxvirtualserver.org/wiki/Dynamic_Feedback_Load_Balancing_Schedu
ling

But, when I look at the scheduler algorithms available from ipvsadm,
there does not seem to be one for the dynamic scheduling.

Is that still experimental?

Thanks,
        Neil


--
Neil Aggarwal, (281)846-8957, http://UnmeteredVPS.net/centos
Virtual private server with CentOS 5.5 preinstalled
Unmetered bandwidth = no overage charges 


_______________________________________________
Please read the documentation before posting - it's available at:
http://www.linuxvirtualserver.org/

LinuxVirtualServer.org mailing list - [email protected]
Send requests to [email protected]
or go to http://lists.graemef.net/mailman/listinfo/lvs-users

Reply via email to