On Sat, 2010-09-25 at 10:44 -0700, R James wrote: > Yeah, if I move the physical server about 2 miles. I can plug it into > a better ISP. BTW, I once calculated (test plus extrapolation) how long it would take to rebuild every package in Mandriva on a low end 2 GHz Celeron server that I had available and it came to about 80 days.
Usually one won't rebuild every package all in one go, but one has to do that the first time. So, a build system needs to be a big ass piece of iron, otherwise it will be frustrating to use. _______________________________________________ Mageia-dev mailing list [email protected] https://www.mageia.org/mailman/listinfo/mageia-dev
