Hi all,
Please help me out in the following problem.
        I have a set of Autocad(R14) drawings in dwg format, showing a cable which 
spreads across 5 sheets.  I have each of them as independent drawings.  I want to take 
them into MI. If I do it with UT  how do I ensure the spatial continuity of the cable. 
I get them as different entities with out any continuity. Is there any work around?

Looking forward to hearing from you

With regards,
John Mathew
Tata Infotech Limited
India
----------------------------------------------------------------------
To unsubscribe from this list, send e-mail to [EMAIL PROTECTED] and put
"unsubscribe MAPINFO-L" in the message body, or contact [EMAIL PROTECTED]

Reply via email to