Tasks fail after the first disk (/grid/0/) of all TTs reaches 100%, even though 
other disks still have space.
-------------------------------------------------------------------------------------------------------------

                 Key: MAPREDUCE-1296
                 URL: https://issues.apache.org/jira/browse/MAPREDUCE-1296
             Project: Hadoop Map/Reduce
          Issue Type: Bug
          Components: contrib/capacity-sched
    Affects Versions: 0.20.2
            Reporter: Iyappan Srinivasan


Tasks fail after the first disk (/grid/0/) of all TTs reaches 100%, even though 
other disks still have space.

In a cluster, data is distributed almost uniformly.  Disk /grid/0/ reaches 100% 
first, because of extra filling up of info like logs etc. After it reaches 100% 
tasks starts to fail with the error, 

java.lang.Throwable: Child Error
        at org.apache.hadoop.mapred.TaskRunner.run(TaskRunner.java:516)
Caused by: java.io.IOException: Task process exit with nonzero status of 1.
        at org.apache.hadoop.mapred.TaskRunner.run(TaskRunner.java:503)


This happens even though the other disks are still at 80%, so still can be 
filled up more.

Steps to reproduce:

1) Bring up  a cluster with Linux task controller.
2) Start filling the dfs up with data using randomwriter or teragen.
3) Once the first disk reaches 100%, the tasks are starting to fail.


-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.

Reply via email to