Tasks fail after the first disk (/grid/0/) of all TTs reaches 100%, even though
other disks still have space.
-------------------------------------------------------------------------------------------------------------
Key: MAPREDUCE-1296
URL: https://issues.apache.org/jira/browse/MAPREDUCE-1296
Project: Hadoop Map/Reduce
Issue Type: Bug
Components: contrib/capacity-sched
Affects Versions: 0.20.2
Reporter: Iyappan Srinivasan
Tasks fail after the first disk (/grid/0/) of all TTs reaches 100%, even though
other disks still have space.
In a cluster, data is distributed almost uniformly. Disk /grid/0/ reaches 100%
first, because of extra filling up of info like logs etc. After it reaches 100%
tasks starts to fail with the error,
java.lang.Throwable: Child Error
at org.apache.hadoop.mapred.TaskRunner.run(TaskRunner.java:516)
Caused by: java.io.IOException: Task process exit with nonzero status of 1.
at org.apache.hadoop.mapred.TaskRunner.run(TaskRunner.java:503)
This happens even though the other disks are still at 80%, so still can be
filled up more.
Steps to reproduce:
1) Bring up a cluster with Linux task controller.
2) Start filling the dfs up with data using randomwriter or teragen.
3) Once the first disk reaches 100%, the tasks are starting to fail.
--
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.