https://issues.apache.org/jira/browse/MAPREDUCE-279?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12997648#comment-12997648
]
Scott Carey commented on MAPREDUCE-279:
---------------------------------------
{quote}
Consider a 10k node cluster with 25-30 containers per node and 10k running jobs
- we'd need at least 10k * 10k watches which is a lot for ZK
{quote}
Thanks for the info Arun. There would be a lot to work out to mix in ZK and
not run into a scalability wall.
If you assume that each node has to watch every job, its not going to scale.
If each node is only watching one thing when in need of work ("Is there work
for me?") you can get a large chunk of the RPC that causes delayed task starts
gone. I'm mainly thinking of the "is there work for me now? what about now?
And now?" RPC that goes on in hadoop today. That could be inverted into "flag
three nodes with local data simultaneously that there is work for them, the
first to grab the item wins". How valuable is replacing just part of the RPC?
I'm not sure. It would help my clusters, but they aren't that big.
The other part of the scheduling problem you allude to that requires scanning
all available jobs and assigning resources would need some clever work to do in
ZK without scalability problems.
On a related item, I am glad that job submission includes a DAG of tasks.
There is a lot of opportunity to reduce latency in job flows there and
consolidate work from a half-dozen projects duplicating effort.
{quote}
It is becoming much harder, not easier to evolve the hadoop code base.
{quote}
The choice to have all three projects be in their own trunk/tags/branches was a
mistake IMO. I've done the same elsewhere and learned the hard way: don't put
projects under different version trees unless you intend to actually completely
decouple them *and* release them separately.
Hadoop needs more modularity and plugability, but making Cluster Management and
Application Management plug-able does not depend on separate projects, its the
other way around. Hadoop needs to become more modular internally, its build
more sophisticated, and the build outputs more flexible. After a user can swap
out foo-resource-manager.jar with hadoop-resource-manager.jar behind
resource-manager-api.jar and expect it to work, a separate project for the
hadoop-resource-manager could make sense.
That said, I agree with Eric's #1 -- future modularity and this work are
separate discussions / items. IMO any greater project restructuring related to
cluster management depends on this, and not the other way around. A project
split should not be the enforcer of for modularity, actual proven modularity
should be justification for a split. If one is afraid that without a project
split, things are bound to be intertwined, other solutions should be found.
Releasing separate jars for the components is one way to move forward that does
not need a project split -- though it might require Maven to make it easy to
manage and make a split much easier.
> Map-Reduce 2.0
> --------------
>
> Key: MAPREDUCE-279
> URL: https://issues.apache.org/jira/browse/MAPREDUCE-279
> Project: Hadoop Map/Reduce
> Issue Type: Improvement
> Components: jobtracker, tasktracker
> Reporter: Arun C Murthy
> Assignee: Arun C Murthy
> Fix For: 0.23.0
>
>
> Re-factor MapReduce into a generic resource scheduler and a per-job,
> user-defined component that manages the application execution.
--
This message is automatically generated by JIRA.
-