[ 
https://issues.apache.org/jira/browse/MAPREDUCE-1871?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Arun C Murthy updated MAPREDUCE-1871:
-------------------------------------

    Status: Open  (was: Patch Available)

Sorry to come in late, the patch has gone stale. Can you please rebase? Thanks.

Given this is not an issue with MRv2 should we still commit this? I'm happy to, 
but not sure it's useful. Thanks.

> Create automated test scenario for "Collect information about number of tasks 
> succeeded / total per time unit for a tasktracker"
> --------------------------------------------------------------------------------------------------------------------------------
>
>                 Key: MAPREDUCE-1871
>                 URL: https://issues.apache.org/jira/browse/MAPREDUCE-1871
>             Project: Hadoop Map/Reduce
>          Issue Type: Test
>          Components: test
>    Affects Versions: 0.21.0
>            Reporter: Iyappan Srinivasan
>            Assignee: Iyappan Srinivasan
>         Attachments: 1871-ydist-security-patch.txt, 
> 1871-ydist-security-patch.txt, 1871-ydist-security-patch.txt, 
> 1871-ydist-security-patch.txt, 1871-ydist-security-patch.txt, 
> 1871-ydist-security-patch.txt, 1871-ydist-security-patch.txt, 
> 1871-ydist-security-patch.txt, 1871-ydist-security-patch.txt, 
> MAPREDUCE-1871.patch, MAPREDUCE-1871.patch, MAPREDUCE-1871.patch, 
> MAPREDUCE-1871.patch, MAPREDUCE-1871.patch
>
>
> Create automated test scenario for "Collect information about number of tasks 
> succeeded / total per time unit for a tasktracker"
> 1) Verification of all the above mentioned fields with the specified TTs. 
> Total no. of tasks and successful tasks should be equal to the corresponding 
> no. of tasks specified in TTs logs
> 2)  Fail a task on tasktracker.  Node UI should update the status of tasks on 
> that TT accordingly. 
> 3)  Kill a task on tasktracker.  Node UI should update the status of tasks on 
> that TT accordingly
> 4) Positive Run simultaneous jobs and check if all the fields are populated 
> with proper values of tasks.  Node UI should have correct valiues for all the 
> fields mentioned above. 
> 5)  Check the fields across one hour window  Fields related to hour should be 
> updated after every hour
> 6) Check the fields across one day window  fields related to hour should be 
> updated after every day
> 7) Restart a TT and bring it back.  UI should retain the fields values.  
> 8) Positive Run a bunch of jobs with 0 maps and 0 reduces simultanously.

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to