[ 
https://issues.apache.org/jira/browse/MAPREDUCE-4299?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Robert Joseph Evans updated MAPREDUCE-4299:
-------------------------------------------

       Resolution: Fixed
    Fix Version/s: 3.0.0
                   2.0.1-alpha
                   0.23.3
           Status: Resolved  (was: Patch Available)

Thanks for the fix Tom.  I merge this into trunk, branch-2, and branch-0.23
                
> Terasort hangs with MR2 FifoScheduler
> -------------------------------------
>
>                 Key: MAPREDUCE-4299
>                 URL: https://issues.apache.org/jira/browse/MAPREDUCE-4299
>             Project: Hadoop Map/Reduce
>          Issue Type: Bug
>          Components: mrv2
>    Affects Versions: 2.0.0-alpha
>            Reporter: Tom White
>            Assignee: Tom White
>             Fix For: 0.23.3, 2.0.1-alpha, 3.0.0
>
>         Attachments: MAPREDUCE-4299.patch, MAPREDUCE-4299.patch, 
> MAPREDUCE-4299.patch
>
>
> What happens is that the number of reducers ramp up until they occupy all of 
> the job's containers, at which point the maps no longer make any progress and 
> the job hangs.
> When the same job is run with the CapacityScheduler it succeeds, so this 
> looks like a FifoScheduler bug.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: 
https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to