[ https://issues.apache.org/jira/browse/MAPREDUCE-2264?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13564993#comment-13564993 ]
Hadoop QA commented on MAPREDUCE-2264: -------------------------------------- {color:green}+1 overall{color}. Here are the results of testing the latest attachment http://issues.apache.org/jira/secure/attachment/12566880/MAPREDUCE-2264-trunk-5.patch against trunk revision . {color:green}+1 @author{color}. The patch does not contain any @author tags. {color:green}+1 tests included{color}. The patch appears to include 1 new or modified test files. {color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings. {color:green}+1 javadoc{color}. The javadoc tool did not generate any warning messages. {color:green}+1 eclipse:eclipse{color}. The patch built with eclipse:eclipse. {color:green}+1 findbugs{color}. The patch does not introduce any new Findbugs (version 1.3.9) warnings. {color:green}+1 release audit{color}. The applied patch does not increase the total number of release audit warnings. {color:green}+1 core tests{color}. The patch passed unit tests in hadoop-mapreduce-project/hadoop-mapreduce-client/hadoop-mapreduce-client-core. {color:green}+1 contrib tests{color}. The patch passed contrib unit tests. Test results: https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/3288//testReport/ Console output: https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/3288//console This message is automatically generated. > Job status exceeds 100% in some cases > -------------------------------------- > > Key: MAPREDUCE-2264 > URL: https://issues.apache.org/jira/browse/MAPREDUCE-2264 > Project: Hadoop Map/Reduce > Issue Type: Bug > Components: jobtracker > Affects Versions: 0.20.2, 0.20.205.0 > Reporter: Adam Kramer > Assignee: Devaraj K > Labels: critical-0.22.0 > Fix For: 1.2.0, 2.0.3-alpha > > Attachments: MAPREDUCE-2264-0.20.205-1.patch, > MAPREDUCE-2264-0.20.205.patch, MAPREDUCE-2264-0.20.3.patch, > MAPREDUCE-2264-branch-1-1.patch, MAPREDUCE-2264-branch-1-2.patch, > MAPREDUCE-2264-branch-1.patch, MAPREDUCE-2264-trunk-1.patch, > MAPREDUCE-2264-trunk-1.patch, MAPREDUCE-2264-trunk-2.patch, > MAPREDUCE-2264-trunk-3.patch, MAPREDUCE-2264-trunk-4.patch, > MAPREDUCE-2264-trunk-5.patch, MAPREDUCE-2264-trunk-5.patch, > MAPREDUCE-2264-trunk.patch, more than 100%.bmp > > > I'm looking now at my jobtracker's list of running reduce tasks. One of them > is 120.05% complete, the other is 107.28% complete. > I understand that these numbers are estimates, but there is no case in which > an estimate of 100% for a non-complete task is better than an estimate of > 99.99%, nor is there any case in which an estimate greater than 100% is valid. > I suggest that whatever logic is computing these set 99.99% as a hard maximum. -- This message is automatically generated by JIRA. If you think it was sent incorrectly, please contact your JIRA administrators For more information on JIRA, see: http://www.atlassian.com/software/jira