[ https://issues.apache.org/jira/browse/MAPREDUCE-5059?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13613361#comment-13613361 ]
Hadoop QA commented on MAPREDUCE-5059: -------------------------------------- {color:green}+1 overall{color}. Here are the results of testing the latest attachment http://issues.apache.org/jira/secure/attachment/12575435/MAPREDUCE-5059-20130325.patch against trunk revision . {color:green}+1 @author{color}. The patch does not contain any @author tags. {color:green}+1 tests included{color}. The patch appears to include 3 new or modified test files. {color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings. {color:green}+1 javadoc{color}. The javadoc tool did not generate any warning messages. {color:green}+1 eclipse:eclipse{color}. The patch built with eclipse:eclipse. {color:green}+1 findbugs{color}. The patch does not introduce any new Findbugs (version 1.3.9) warnings. {color:green}+1 release audit{color}. The applied patch does not increase the total number of release audit warnings. {color:green}+1 core tests{color}. The patch passed unit tests in hadoop-mapreduce-project/hadoop-mapreduce-client/hadoop-mapreduce-client-hs. {color:green}+1 contrib tests{color}. The patch passed contrib unit tests. Test results: https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/3468//testReport/ Console output: https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/3468//console This message is automatically generated. > Job overview shows average merge time larger than for any reduce attempt > ------------------------------------------------------------------------ > > Key: MAPREDUCE-5059 > URL: https://issues.apache.org/jira/browse/MAPREDUCE-5059 > Project: Hadoop Map/Reduce > Issue Type: Bug > Components: jobhistoryserver, webapps > Reporter: Jason Lowe > Assignee: omkar vinit joshi > Attachments: MAPREDUCE-5059-20130325.patch > > > When looking at a job overview page on the history server, the Average Merge > Time is often reported with a value that is far larger than the Elapsed Merge > Time shown for any reduce task attempt. The job overview page calculates the > merge time as the time delta between the sort finishing and the job launching > while the attempts page calculates it as the time delta between the sort > finishing and the shuffle finishing. -- This message is automatically generated by JIRA. If you think it was sent incorrectly, please contact your JIRA administrators For more information on JIRA, see: http://www.atlassian.com/software/jira