[ 
https://issues.apache.org/jira/browse/MAPREDUCE-5019?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13615072#comment-13615072
 ] 

Damien Hardy commented on MAPREDUCE-5019:
-----------------------------------------

I just discover the option :
 mapred.reduce.slowstart.completed.maps (default is 0.05) 
that could be used to prevent big job from staling smaller ones waiting for 
reducer slots.
Trying with a value of 0.8 (80% of mappers have to be terminated before 
starting reducers)
                
> Fair scheduler should allow peremption on reducer only
> ------------------------------------------------------
>
>                 Key: MAPREDUCE-5019
>                 URL: https://issues.apache.org/jira/browse/MAPREDUCE-5019
>             Project: Hadoop Map/Reduce
>          Issue Type: Improvement
>          Components: mrv1, scheduler
>    Affects Versions: 2.0.2-alpha
>         Environment: CDH4.1.2
>            Reporter: Damien Hardy
>            Priority: Minor
>              Labels: scheduler, scheduling
>
> Fair scheduler is very good.
> But having a big MR job running lots of mapper and reducer( 10M + 10R )
> Then a small MR on the same pool (1M + 1R)
> having slots for 10 mapper and 10 reducer
>  - The big job take all the map slots
>  - The small job wait for a map slot
>  - 1rst big job map task finish
>  - the small job take the map slot it needs
>  - meanwhile all the reducer of the big job take all the reducer slot to copy 
> and sort
>  - the small job end is map and wait for the all maps to end and for 1 
> reducer to end before accessing for a reducer slot.
>  - all the reducer stalled after sorting waiting for the mapper to end one  
> by one...
> If I have a big job and a lot of small, I don't want new small arriving  and 
> killing running map tasks of big job to get a slot.
> I think it could be useful that the small job can kill a reducer tasks (and 
> only reducer) to end before the big job finish all its map tasks and a 
> reducer.
> rules can be : a job having all its map finished and waiting for reducer slot 
> can kill reducer tasks from a job that still have map slot running (assuming 
> they are just waiting for copy and sort)

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to