[
https://issues.apache.org/jira/browse/MAPREDUCE-4815?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14094931#comment-14094931
]
Hadoop QA commented on MAPREDUCE-4815:
--------------------------------------
{color:green}+1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12661324/MAPREDUCE-4815.v3.patch
against trunk revision .
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 3 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. There were no new javadoc warning messages.
{color:green}+1 eclipse:eclipse{color}. The patch built with
eclipse:eclipse.
{color:green}+1 findbugs{color}. The patch does not introduce any new
Findbugs (version 2.0.3) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in
hadoop-mapreduce-project/hadoop-mapreduce-client/hadoop-mapreduce-client-core.
{color:green}+1 contrib tests{color}. The patch passed contrib unit tests.
Test results:
https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/4801//testReport/
Console output:
https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/4801//console
This message is automatically generated.
> FileOutputCommitter.commitJob can be very slow for jobs with many output files
> ------------------------------------------------------------------------------
>
> Key: MAPREDUCE-4815
> URL: https://issues.apache.org/jira/browse/MAPREDUCE-4815
> Project: Hadoop Map/Reduce
> Issue Type: Bug
> Components: mrv2
> Affects Versions: 0.23.3, 2.0.1-alpha, 2.4.1
> Reporter: Jason Lowe
> Assignee: Siqi Li
> Attachments: MAPREDUCE-4815.v3.patch
>
>
> If a job generates many files to commit then the commitJob method call at the
> end of the job can take minutes. This is a performance regression from 1.x,
> as 1.x had the tasks commit directly to the final output directory as they
> were completing and commitJob had very little to do. The commit work was
> processed in parallel and overlapped the processing of outstanding tasks. In
> 0.23/2.x, the commit is single-threaded and waits until all tasks have
> completed before commencing.
--
This message was sent by Atlassian JIRA
(v6.2#6252)