> If on a TaskTracker, the maximum limit of tasks is set to N, N
> parallel tasks may be run on it. The N is set to two by default (since
> most machines today are 2+ core'd). You can tweak this parameter to
> reflect one, and then you'll see only a maximum of one Task running on
> the TaskTracker at a given time.

Depending on data locality, however, that could actually make things run
more slowly.  (In principle, anyway; I don't have even anecdotal evidence
to back that up. :-)  I'm sure one could construct a particular set of
hardware with a particular data layout for which it would be true, though.)

Greg

Reply via email to