The only way to do that is to drop the setting down to one and bounce
the TaskTrackers.

-Joey

On Tue, Jun 21, 2011 at 12:52 PM, Jonathan Zukerman
<zukermanjonat...@gmail.com> wrote:
> Hi,
> Is there a way to set the maximum map tasks for all tasktrackers in my
> cluster for a certain job?
> Most of my tasktrackers are configured to handle 4 maps concurrently, and
> most of my jobs don't care where does the map function run. But small part
> of my jobs requires that no two map functions will run from the same IP at
> the same time, i.e., the maximum number of map tasks for each tasktracker
> should be 1 for these jobs.
> Thanks!
> Jonathan.



-- 
Joseph Echeverria
Cloudera, Inc.
443.305.9434

Reply via email to