Keith and I went through all the existing issues and feature requests (and
added a few) and divided them into two categories.  Those we thought
warranted consideration for 1.1 (which we assigned to the 1.1 milestone),
and those which we don't mind postponing to a future release (1.2? 1.5?
2.0?).

 

Lacking an appropriate milestone, the latter issues are all currently
assigned to "none".  We should add a "v.next" or "future" milestone that we
can keep rolling postponed issues into indefinitely.  Can an admin add such
a milestone (I'd vote for "future", but whatever) and move the "none" issues
there?

 