Hi Shrirang, and Ray,

I have some codes for cpf termination at voltage limit violation. I want to
test it before sending it here.
I choose to enforce voltage limits in similar manner as reactive power
limits. However, it seems I need to modify the mpoption.m. Is this correct?
Alternatively I can send the codes here.




*Engr. AHMAD, Abubakar Sadiq**PhD Student*

*Electrical Engineering.*

*Bayero University, Kano. Nigeria.*

*OR*


*LecturerElectrical and Electronics Engineering,*

*Federal University of Technology,*

*P.M.B, 65, Minna.*
*Nigeria*.
*+2347068043665*

Reply via email to