On Mar 14, 2007, at 10:12 PM, Sarina Adhikari wrote:
I have a small query on Matpower. I noticed that in an optimal
power flow program (fmincopf), all the variables are sent as the parameter and there is no distinction between PV and PQ buses. In traditional Power flow, we have to make a distinction between PQ and PV bus. The limits on reactive power of the PV bus needs to be checked. If it hits the limit,we
treat it as the PQ bus. But, in OPF of Matpower, I didnot notice these
things. Are there any assumptions or modificatiions made to take care of this which I
have overlooked?

Specifying buses as PV or PQ is done in a traditional n-bus power flow problem, because there are 4*n unknowns (P, Q, V, theta at each bus) but only 2*n equations (P and Q power balance at each bus). So in order to solve the equations we must specify values for half of the variables. We traditionally pick those that we either already know (reference theta, P and Q at load buses) or are able to control (V and P at generator buses).

In the context of an optimal power flow, the power balance equations are simply constraints in an optimization problem and it is not necessary to make the PV / PQ distinction for the purpose of finding a solution. If, for example, one would like to hold the voltage constant, it can be done using the voltage constraints. Similarly, for any of the other variables.

I hope this answers your question.

--
Ray Zimmerman