Hi peers,
Im currently using matpower for my thesis. The opfs simultations are running 
quite well, however, I have a question --> what does the term Branch charging 
(inj) in the system summary report means? I am normally getting -0.6 and -0.8 
Mvar. 
 
Converged in 0.31 seconds
Objective Function Value = 58.86 $/hr
================================================================================
|     System Summary                                                           |
================================================================================
 
How many?                How much?              P (MW)            Q (MVAr)
---------------------    -------------------  -------------  -----------------
Buses             16     Total Gen Capacity       9.0          -3.0 to 3.0
Generators        12     On-line Capacity         9.0          -3.0 to 3.0
Committed Gens    12     Generation (actual)      2.2               3.0
Loads              1     Load                     2.2               2.3
  Fixed            1       Fixed                  2.2               2.3
  Dispatchable     0       Dispatchable          -0.0 of -0.0      -0.0
Shunts             0     Shunt (inj)             -0.0               0.0
Branches          15     Losses (I^2 * Z)         0.01              0.01
Transformers       0     Branch Charging (inj)     -               -0.6
Inter-ties         0     Total Inter-tie Flow     0.0               0.0
Areas              1
thanks for your help