Dear Doctor Zimmerman,

I am running optimal power flows on Matpower 4.1. I have noticed that the 
property "PMIN" forces generators to be dispatched. Then some of them are 
dispatched at their minimum power output even thought there is cheaper 
generation across the system (part loaded generators). Is there any way to 
disable this?

Best regards,
Jose


Reply via email to