Hi all
I am curious if it is possible to perform OPF for a power network over time.
For example, to perform a simulation for a network in 24 hours, where we
consider one scenario each hour, i.e. 24 individual OPF. However, by including
for example ramping limits, these 24 individual OPF problems will be coupled
and should be solved together taking ramping limits into account.
Has anyone done this before using MATPOWER?
Sincerely,
Benjamin
Benjamin Biegel
Civilingeniør
PhD-studerende, Aalborg Universitet
[email protected]
www.benjaminbiegel.com
+45 2819 7620