Dear all, 



By using Matpower for OPF solution with several
solvers I recognize that the solution has a bit difference, maybe you tell me
that this difference is not important for OPF, but I found it crucial if I used
the obtained point as initial point in my research, bellow you find an example
with explanation:


The solved case is New-England power
system, the obtained OPF with FMINCON (520 in mpoption)


Bus     
                   Voltage                                 Generation           
  

  #             Mag(pu)          Ang(deg)           P (MW)  
     Q (MVAr)   

30 
            1.012               -2.924              244.61             -78.21   
    

31              1.087               -0.000              570.84             
427.49      

32 
            1.030                1.981              647.05             194.82   
    

33 
            1.015                3.514              636.83             107.29   
    

34 
            1.022                2.268              513.32             137.83   
    

35 
            1.062               5.410               656.12             160.27   
    

36 
            1.090               7.896               563.70             116.85   
    

37 
            1.046               2.359               539.02              39.18   
    

38 
            1.045               7.701               836.45             19.06    
   

39 
            1.051               -9.700               983.52    
       48.70   

The objective function (520) is: 61748.05 $/hr

 

Then same case_name is solved by using
MIPs solver (560) and the results are:

 

Bus     
                  Voltage                                  Generation           
  

  #             Mag(pu)          Ang(deg)           P (MW)  
     Q (MVAr)   

30 
            1.012               -2.926              244.61              -78.15  
     

31 
            1.087               0.000               570.84             427.02   
   

32 
            1.030               1.980               647.05             195.11   
    

33 
            1.015               3.512               636.83             107.31   
    

34 
            1.022                2.267               513.32  
          137.82       

35 
            1.062                5.409              656.12             160.31   
    

36 
            1.090                7.894              563.70             116.82   
    

37 
            1.046               2.357                539.02   
         39.19       

38 
            1.045               7.700               836.45             19.07    
   

39 
            1.051               -9.702               983.52   
         48.74   

The objective function (of 560) is: 61748.06 $/hr

 The difference is in red.


Then what I did, because the large
difference is in Q(MVAr) I took LamQ= - LamQ in the
Hessian file and I run OPF with MIPs solver, the results are bellow:

 

  Bus     
                     Voltage                                    Generation      
       

    #                Mag(pu)          Ang(deg)            P (MW)     
   Q (MVAr)   

   30                 1.012               -2.924              244.61            
  -78.22       

   31                 1.087               0.000               570.84            
 427.49      

   32                 1.030               1.981                647.05   
        194.82       

   33                 1.015   
           3.514                636.83   
        107.30       

   34                 1.022               2.268
              513.32             137.82       

   35                 1.062               5.410               656.12            
 160.27       

   36                 1.090               7.896               563.70            
 116.85       

   37                 1.046               2.359               539.02            
 39.18       

   38                 1.045               7.701               836.45            
 19.06       

   39                 1.051               -9.700              983.52            
  48.71   

The
objective function now (of 560) is same as above: 61748.06 $/hr

 

Now
the results are nearly closer to the results of FMINCON but still have too
small difference which still caused for mea problem if I take this point as 
initial point
of my work.

 

What
do you think? Is there any suggestion? And what I did is right or no?

 

Thanks


 

                                          