Spinning reserve is not included in the standard OPF. See section 6.5.1 in the 
User’s Manual for information on extensions to the OPF for including reserves.

All of the OPF outputs are summarized in Table 5-1 in the User’s Manual.

    Ray

On Mar 9, 2014, at 12:34 AM, deepak..... <[email protected]> wrote:

> Sir,
> in standard OPF is the cost of Spinning reserve included in obj function.If
> i want to find out the SR cost separately how to do so.
> 
> Also, If i want to check a specific condition based on pf/opf result how to
> proceed. Example - I need to check sum of generation constraint ,or a
> constraint which consists power flow through some lines .
> Thanks

Reply via email to