Dear Dr Zimmerman,

 I have the attached case which converges with runopf_w_res and I have left
the reserve contribution of the dis patchable load positive.

 Would you think this model could work?

Regards
  Tommy


On Thu, Mar 13, 2014 at 6:50 PM, Ray Zimmerman <[email protected]> wrote:

> I don't think this scenario makes sense in the context of the reserve
> market as implemented, which is only for positive reserves. The constraint
> in (6.4) means that the reserve quantity for a dispatchable load would be
> negative, so it doesn't contribute positively to the requirement in (6.5)
> and I don't think it would be non-zero.
>
> In any case, that reserve implementation was not designed with
> dispatchable loads in mind.
>
> --
> Ray Zimmerman
> Senior Research Associate
> B30 Warren Hall, Cornell University, Ithaca, NY 14853
> phone: (607) 255-9645
>
>
>
> On Mar 12, 2014, at 3:19 PM, Tommy k <[email protected]> wrote:
>
> Dear Dr Zimmerman,
>
>   Thank you, that worked. Would it be possible to price a dis-patchable
> load out  of the energy market but leave it  competitive as a reserve
> resource?
>
> Regards
>  Tom
>
>
> On Wed, Mar 12, 2014 at 12:58 PM, Ray Zimmerman <[email protected]> wrote:
>
>> There is nothing special about 3-bus models, but even the standard OPF
>> (without reserves) is infeasible on your 3-bus case. Try relaxing the
>> voltage limits on buses 1 and 2 and relaxing the line limits until you can
>> get runopf() to converge. Then you can gradually tighten up the constraints
>> and see where the problems arise. Once you have a converging OPF with
>> reasonable values, try adding the co-optimization of reserves.
>>
>>    --
>> Ray Zimmerman
>> Senior Research Associate
>> B30 Warren Hall, Cornell University, Ithaca, NY 14853
>> phone: (607) 255-9645
>>
>>
>>
>> On Mar 11, 2014, at 6:10 PM, Tommy k <[email protected]> wrote:
>>
>> Dear Dr Zimmerman,
>>
>>   The attached 3 bus case file which converges with runpf but not with
>>  runopf_w_res('case3',mpopt,'test1','test2');
>>
>>   Will co-optimisation not work on a three bus model?
>>
>>
>> Thanks
>>  Tom
>> <case3.m>
>>
>>
>>
>
>

Attachment: case3.m
Description: Binary data