Set its bus type = 4 (isolated bus). See Table B-1 in the manual.

Shri

From:  ahmad rezaee <[email protected]>
Reply-To:  MATPOWER discussion forum <[email protected]>
Date:  Fri, 27 Jun 2014 08:58:15 -0700
To:  MATPOWER discussion forum <[email protected]>
Subject:  Re: simulating the outage of a generator


>Thank you very much. Can you please tell me how can I put a bus out of
>the system? Actually, in IEEE 14 bus system, when branches 1 and 2 are
>out, bus 1 is disconnected from the system. How I should simulate this?
>
>
>Thanks again
>
>Regards
>
>Ahmad
>
> 
>
>
>     On Friday, June 27, 2014 6:37 AM, "Abhyankar, Shrirang
> G." <[email protected]> wrote:
>  
>  
>
> Yes.
>
>On Jun 27, 2014, at 4:28 AM, "ahmad rezaee" <[email protected]>
>wrote:
>
>
>
>Dear all
>
>For simulating the outage of a generator, just changing the 8th column of
>mpc.gen (the column related to the status of that generator) to zero is
>enough? This change truly simulates the outage of that generator?
>
>Thank you very much
>
>Kind Regards
>Ahmad
>
> 
>
>
>
>
>
>
>
>
>
>
>  
> 
>  
> 



Reply via email to