Set its bus type = 4 (isolated bus). See Table B-1 in the manual. Shri
From: ahmad rezaee <[email protected]> Reply-To: MATPOWER discussion forum <[email protected]> Date: Fri, 27 Jun 2014 08:58:15 -0700 To: MATPOWER discussion forum <[email protected]> Subject: Re: simulating the outage of a generator >Thank you very much. Can you please tell me how can I put a bus out of >the system? Actually, in IEEE 14 bus system, when branches 1 and 2 are >out, bus 1 is disconnected from the system. How I should simulate this? > > >Thanks again > >Regards > >Ahmad > > > > > On Friday, June 27, 2014 6:37 AM, "Abhyankar, Shrirang > G." <[email protected]> wrote: > > > > Yes. > >On Jun 27, 2014, at 4:28 AM, "ahmad rezaee" <[email protected]> >wrote: > > > >Dear all > >For simulating the outage of a generator, just changing the 8th column of >mpc.gen (the column related to the status of that generator) to zero is >enough? This change truly simulates the outage of that generator? > >Thank you very much > >Kind Regards >Ahmad > > > > > > > > > > > > > > > >
