Yes. Ray
On Jul 16, 2014, at 10:52 PM, Sashireka Appalasamy <[email protected]> wrote: > Dear Dr. Zimmerman, > > From the manual it is given that : > RATE A -MVA rating A (long term rating) > > RATE B -MVA rating B (short term rating) > > RATE C -MVA rating C (emergency rating) > > Does this mean that RATE A, RATE B and RATE C are the real valued limits for > either MW or MVA on a given transmission line for a long term, short term and > emergency scehduling cases? > > Sincerely, > Sashi >
